TASARIMDAN İMALATA
Injection Pressure and Clamping Force


A: total projected area of all cavities and cold runners on the parting plane (cm²). P: cavity pressure (bar). F: force (kN). Hydraulic pressure, plastic pressure ahead of the screw and cavity pressure are different.
F (kN) = A (cm²) × P (bar) / 100
1 tf = 9.80665 kN
1 tf = 9.80665 kN
Example: A = 200 cm², P = 400 bar → F = 800 kN ≈ 81.6 tonnes-force. This is a calculation example only; machine selection also requires an appropriate allowance, mould dimensions, tie-bar spacing and shot capacity.
| A (cm²) | P (bar) | F (kN) | F (tf) |
|---|---|---|---|
| 50 | 400 | 200 | 20.39 |
| 100 | 400 | 400 | 40.79 |
| 200 | 400 | 800 | 81.58 |
| 400 | 400 | 1600 | 163.15 |
Filling → packing → cooling → opening → ejection. Filling is speed controlled; packing compensates shrinkage. Monitor transfer position, cushion and part weight together.